PRE-FEASIBILITY/FEASIBILITY/DESIGN RFP & TOR FOR GOP PROJECTS |
Notice for Prequalification of Contractors for Maintenance works(FY 2008-09) |
 |
PQ Notice For Maintenance Works for FY.2008-09 |
 |
EOI (M-2) |
 |
INDICATIVE TERM SHEET FOR LOAN OF RS 6 BILLION |
 |
EOI from banks for term loan facility to NHA. |
 |
Commercial Feasibility Study for Construction of Mithankot Bridge Over River Indus Connecting Chachran and Mithankot on Built-operate and Transfer (BOT) Basis |
 |
Detailed Design of Bridge Over River Indus Connecting JHERRUK (N-5) and MULLA KATYAR (JMB) |
 |
Expression Of Interest N-75 Package-III |
 |
RFP: Revaluation of Fixed Assets (Freehold Land, Roads on Freehold Land, Buildings on Freehold Land and Bridges) |
 |
Feasibility Study and Detailed Design of Additional Carriageway (ACW) of LAKPASS-NOSHKI Section on N-40 |
 |
Feasibility Study and Detailed Design of Additional Carriageway (ACW) of QUETTA-DHADAR Section on N-65 |
 |
PQ/EOI DOCUMENT FOR DESIGN REVIEW AND CONSTRUCTION SUPERVISION OF FLY OVER BRIDGES ON N-5 AT SHAH HUSSAIN CHOUK (KM 447) |
 |
request for expression of intrest for design review and construction supervision of flyover bridges on N-5 at shah hussain chowk (km-447) |
 |
TOR & Financial Forms for Pre-feasibility Study of Road from KHARIAN (N-5) to JHANG via MANDI BAHAUDIN, SALAM AND SARGODHA |
 |
Feasibility Study / Detailed Design of Flyover Bridge from Lahori Chowk (Murtaza Chowk) to Sheikh Zaid Chowk in LARKANA City. |
 |
pre qualification of contractors |
 |
contract award proforma 1 |
 |
Topographic Survey for in-house Design of Remaining 85 Kms Road Section Multan-Shujabad-Jalalpur Priwala and Uch Sharif - TMP Section of N-115 Highway |
 |
Geotechnical Investigation for in-house Design of Remaining 85 Kms Road Section Multan-Shujabad-Jalalpur Priwala and Uch Sharif - TMP Section of N-115 Highway |
 |
PQ/EOI Document For Construction Supervision Of Amri_kazi Ahmed Bridge Over River Indus Along With Approch Road & River Traning Works |
 |
Preparation and Maintenance of Computerized CSR |
 |
General Consultent for Topographic Surveys for In-House Designs |
 |
Detailed Design of Bridge Over River Indus Connecting N-5 With N-55 (Indus Highway) Near Nishtar Ghat. |
 |
Tor for Hiring of Quantity Surveying and Estimation Specialist Team. |
 |
Feasibility and Design of Khanozai to Lorali (N-70) Spera Ragha (95 Km) |
 |
Feasibility Study & Detailed Design for Construction of Loraliai (Dirgi Shabozai) to Taunsa Road a. Dargi Shabozai(Loralai N-70) - Margna Kabzai - Sarghundi Musa Khele (103 Kms Approx.), b. Musa Khel |
 |
ADB-NTCHIP - MFF Ln.#2400/2401 Project Management Suport (PMS) |
 |
ADB-NTCHIP - MFF Ln.#2400/2401 Cumulative Environmental Impact Assesment (CEIA) |
 |
TOR for Supervision Of Development /Establishment of Plantation (Afforestation) Contracts - NHIP-WB |
 |
PreQualifiaction of Contractors |
 |
Tendor Notice Periodic Maintenance & Highway Safety Works 27-04-2010 |
 |
PQ/EOI DOCUMENT FOR CONSTRUCTION FOR SUPER VISION FOR ROAD FROM HYDERABAD-BADIN TO MIRWAH SANJAR CHANG |
 |
Circular for Protection of Womens At work place |
 |
EOI for complete design of NHA Bulding / Resthouses |
 |
Dualization of Kutchlak-Saran Section of (N-25) |
 |
Open Auction Notice of Kamra Underpass |
 |
Notice for NH & MP Police Fine Collection |
 |
Pre Qulification for Highway Safety work |
 |
Tendor Notice for Highway Safety work |
 |
Pre Qulification for Dualization/ of Existing Indus Highway |
 |
Invitation for Technical and Financial Proposals |
 |
02-06-2010(MaintenenceWork) |
 |
02-06-2010(corriengdum) |
 |
02-06-2010(Prequalificationforemergencymaintenence) |
 |
02-06-2010(PeriodicmainteneceWork) |
 |
02-06-2010(HiringtheSevicesofC.A) |
 |
ApplicationForm |
 |
Corrigendum for Prequalification Notice 11-06-10 |
 |
RFP for Supervision of Afforestation |
 |
|
DESIGN TOR / RFP FOR AIDED PROJECTS |
Independent consultant for Preparation and Implementation of Resettlement Action Plan (RAP) for Pkg-I(SEHWAN - KHAIRPUR NATHAN CHAH & Pkg-II(KHAIRPUR NATHAN CHAH - RATODERO) Road Costruction Project |
 |
TOR of Advisory Services for Human Resource Development (HRD) under WB Assisted HRP |
 |
External Monitoring of Land Acquisition and Resettlement Plans for Faisalabad - Gojra Sestion (M-4) |
 |
|
SUPERVISION RFP FOR GOP PROJECTS |
Request for Expression of Interest |
 |
Desigh Review & Construction Supervision of Flyover on N-5 at Shah Hussain Chowk at (Km-447) |
 |
Construction Supervision of Amri-Kazi Bridge (AKB) Over River Indus Alongwith Approach Roads and River Training Works. |
 |
Construction Supervision of Hiran Minar Interchange on Lahore-Islamabad Motorway M-2 at Km 51. (Re-advertised) |
 |
Design Review and Construction Supervision of Interchange on Okara Bypass KM 1133+730 on N-5 |
 |
Construction Supervision of Peshawar Northern Bypass |
 |
Design Review and Construction of SULTAN BAHOO Bridge Over River Chinab Between SHORKOT and GARH MAHARAJA |
 |
Design Review & Construction Supervision of Interchange at Aziz Chowk at Gujranwala on N-5 |
 |
Design Review, Value Enineering and Supervision For Widening / Improvement of BOSAN Road, Multan. |
 |
Construction Supervision for Reconstruction / Construction of Road From HYDERABAD - BADIN Road To MIR WAH - SANJAR CHANG Road (53 Km approx) |
 |
Design Review, Update (Where Redqired), Environmental & Social Assesment and Construction Supervision of BASIMA KHUZDAR N-30 (130 Kms) |
 |
Design Review, Value Enineering and Supervision For Widening / Improvement of BOSAN Road in Multan. |
 |
|
SUPERVISION RFP FOR AIDED PROJECTS |
ADB-NTCHIP Construction Supervision of Four Lane Expressway Faisalabad-Khanewal (M-4) 184 Km |
 |
RFP for detailed design and construction supervision for bridge over river indus. |
 |
|
BIDDING / TENDER DOCUMENTS |
BID DOCUMENTS FOR CONSTRUCTION OF PEDESTRIAN OVER HEAD STEEL BRIDGE ON IMDCW PROJECT |
 |
BID DOCUMENTS FOR CONSTRUCTION OF PEDESTRIAN OVER HEAD STEEL BRIDGE ON IMDCW PROJECT |
 |
HS - 25-07 |
 |
opening and evaluation of teder for periodic maintanance works ( seal coat_ asphaltic overlay 5cm and pavement marking at km 43+00 to km 50+00 on KKH N-35 of contract no. PM-NA-09N-3502 |
 |
opening and evaluation of teder for periodic maintanance works ( seal coat_ asphaltic overlay 5cm and pavement marking at km 37+00 to km 43+00 on KKH N-35 of contract no. PM-NA-09N-3501 |
 |
opening and evaluation of tender for peripdic mentanance works (bitmac work _ gabion works_ stone masonery and slide removal from km 82+00to km 125+00 on MNJ N-15 of contract no_ pm NA-09 N-15-07 |
 |
Opening and evaluation of tender for periodic maintenance works (ASPHALT WEARING COURSE,PAVEMENT MARKING,STONE PITCHING AND PCC) from 26+00 to KM 32+00 on (S-2) road of contract no.PM-NA-09/S-2/11 |
 |
Opening and Evaluation of tender for Emergency maintenance work (FOR LANDSLIDE CLEARANCE) AT KM 81+000 to KM 93+600 on MNJ N-15 of contract no.EM-NA-09/N-15/01 |
 |
Opening and Evaluation of tender for Emergency maintenance work (FOR LANDSLIDE CLEARANCE) AT KM 93+700 to KM 95+700 on MNJ N-15 of contract no.EM-NA-09/N-15/02 |
 |
Opening and Evaluation of tender for Emergency maintenance work (FOR LANDSLIDE CLEARANCE) AT KM 96+000 to KM 118+200 on MNJ N-15 of contract no.EM-NA-09/N-15/03 |
 |
Opening and Evaluation of tender for Emergency maintenance work (FOR LANDSLIDE CLEARANCE) AT KM 120+000 to KM 122+300 on MNJ N-15 of contract no.EM-NA-09/N-15/04 |
 |
Specifications For Bids for supply of weigh bridges. |
 |
request for proposal for operational and management of toll plazas |
 |
request for proposal for operational and management of toll plazas |
 |
Revised Criteria for evaluation of Bids for supply of weigh bridges. |
 |
Tender Notice for Improvement of Service Road at KNB SSB |
 |
02-06-2010(corriengdumTenderNotice) |
 |
Maintenence Work |
 |
02-06-2010Maintenence Work |
 |
Tender Notice for electrification work for fiscal year 2009-2010(15-06-2010) |
 |
Upgradation & Widening of KARAKORUM Highway Project Phase2 From THAKOT To SAZIN (188Km) & Improvement & Widening of Jaglot-Skardu Rd Project on Supplier/Buyer Credit Basis(167KM) |
 |
|
PRE-QUALIFICATION QUESTIONNAIRE FOR WORKS & GOODS |
CONTRACTORS FOR MAINTENANCE WORKS (2008-2009) |
 |
Notice for Pre-Qualification Contractors for Nothern Areas(2008-09) |
 |
HS-29-07 |
 |
HS-30-07 |
 |
EM-16-07 |
 |
Pre Qualification of Contractors for the year of 2008-09 |
 |
Pre-qualification for O&M of 9 Toll Plazas advertised on 15th November 2008 |
 |
PRE-QUALIFICATION OF FIRMS FOR VARIOUS ADDITIONAL WORKS ON M-1 |
 |
contract award proforma award 1and2 |
 |
PQ Document For Rehabilation of Existing Carrage way on N-5 |
 |
Construction of Loralai (Dirgi Shabozai) - Margha Kabzai - Musa Khel - Drug Post - Taunsa Sharif In 5 Packages |
 |
Construction of Interchange at Aziz Chowk, Gujranwala on N-5 |
 |
Construction of Bridge Over River Ravi From BASTI DULWAN TEHSIL MAIN CHANHU To DARBAR SHARIF SADHILIAN WALI District TOBA TEK SINGH. (Package-I, II, III) |
 |
Construction of Bridge Over River JEHLUM at Chak NIZAM District Mandi Bahaudin. (Package-I, II, III) |
 |
Construction of Bridge Allongwith Approch Roads and Guide Banks Over River Indus Linking N-5 with N-55 Near Nishtar Ghat. (Package - I, II, III, IV, V) |
 |
Construction of Qazi Ahmed Bypass on N-5 |
 |
Widening and Improvement of BOSAN Road, Multan, Package I & II |
 |
Construction of Flyover at NAG SHAH Chowk (On Multan - Shujabad Road Crossing N-70), Multan City |
 |
FRANCHISE RIGHTS FOR PROMOTIONAL DISPLAYS ON TOLL PLAZAS OF MOTORWAYS (M-1, M-2 & M-3) |
 |
OPERATIONS & MANAGEMENT (O&M) OF 20 TOLL PLAZAS ON NATIONAL HIGHWAY NETWORK |
 |
Construction of Right and Left Guide Banks From Abutments of Bridge Over River Indus Connecting AMRI to QAZI AHMED. Pkg-III (Right Guide Bank From Right Abutment of Bridge), Pkg-IV (Left Guide Bank Fr |
 |
Package-III (Under Section-II package-2B Turbat-Hoshab. Construction of Left Over Works of GAWADAR TURBAT HOSHAB (M-8) |
 |
Package-I (Under Section-I package2A Gawadr-Turbat) Construction of Left Over Works of GAWADAR TURBAT HOSHAB (M-8) |
 |
Construction of Kolpur Bypass (N-65) |
 |
Widening and Improvement of BOSAN ROAD, Multan Phase-II: 2 Lane Flyover from CHUNGI No.6 To Northern Bypass Chowk |
 |
Construction of Peshawar Northern Bypass (32.2 Km) Package-II (Charsada Road - Warsak Road(11.0 Km) (EE Rs. 2270 M), Package-III Warsak Road - thakta Baig, N-5 (11.5 Km) (EE Rs.2270 M) |
 |
Construction Of Road Taking Off From Saeedabad Toll Plaza (N-5) to Benazirabad |
 |
Construction of Multan Northern Bypass from Qasim Bela to Shershah Road, Multan Bypass including Grade Separated Elevated Bridge (Ph:III) N-70 |
 |
Construction of 2-Lane Bridge Over River Indus at Khushal Garh, District KOHAT & Its Approch Roads. (In 03 Packages) |
 |
Prequalification Document of CONSTRUCTION OF 4.LANE MOTORWAY (M-4-EXTENSION ) FROM KHANEWAL TO MULTAN |
 |
Pre-Qualification Notice for Construction of Bridge Across River Indus Linking Jeeluk With Mulla Katiar |
 |
Dualization of KUTCHLAK SARNAN Section of N-25 Km 14+250 to 42+550 |
 |
Construction of Bridge Across River Indus Linking JHEERUK With MULLA KATYAR (KATIAR) in 07 Packages |
 |
Construction of Additional 2-Lane Bridge at Head Muhammad Wala & Other Projects in Southern Punjab. (In 6 Packages) |
 |
Completion of Left Over Works of Five (05) Bridges on Gilgit - Sakardu Road (S-1) |
 |
Construction of NOWSHERA VIRKAN Interchange on Lahore - Islamabad Motorway (M-2) |
 |
Invitation Notice for Prequalification of Construction of Six-Lane Bridges over River Ravi (Package-lV) and Sidhnai Channel (Package_IV-A) 11-06-10 |
 |
Prequalification Document of CONSTRUCTION OF 4.LANE MOTORWAY (M-4-EXTENSION ) FROM KHANEWAL TO MULTAN 11-06-10 |
 |
Invitation Notice for Prequalification of Construction of Six-Lane Bridges over River Ravi (Package-lV) and Sidhnai Channel (Package_IV-A) |
 |
Prequalification Document of CONSTRUCTION OF 4.LANE MOTORWAY (M-4-EXTENSION )FROM KHANEWAL TO MULTAN |
 |
Design for Section LowerTopa to Kohala Bridge of Islamabad-Muzafarabad Project(E-75) |
 |
Request for Expression of Interest for Consultancy Services of Inventory and Condition Survey of Bridges and Culverts on NHA Network |
 |
Addendum No.1 to PQ Document for Dualization / Rehabilitation of Existing Section of Indus Highway (N-55) Including Extension of Ring Road (In 02 Packages) |
 |
Dualization / Rehabilitation of Existing Section of Indus Highway (N-55) Including Extension of Ring Road (In 02 Packages) |
 |
Design & Construction Supervision for Construction for Bridge & Approach Roads(23 Km Approx) |
 |
Construction of 2-Lane Flyover on TAKHT BHAI Railway Crossing On N-45 |
 |
|
EOI DOC / SPECIMEN PQ FORMS FOR SERVICES |
Specimen PQ Forms For Consultants |
 |
Detailed Design of Bridge over River Indus Connecting Sehwan (N-55) and Nawab Wali Muhammad (N-5) |
 |
OPERATION AND MANAGEMENT OF MOTORWAYS : INVITATION FOR EXPRESSION OF INTEREST (EOI) FOR PRE-QUALIFICATION FROM LOCAL AND INTERNATIONAL FIRMS THROUGH INTERNATIONAL COMPETITIVE BIDDING (ICB) |
 |
PQ/EOI For design review and construction supervision for interchange at Aziz Chowk Gujranwala (N-5) |
 |
Procurement of Independent Consultant for Environmental Monitoring on N-5 and Earthquake Damaged Roads - NHIP - NHA |
 |
Preparation of GIS based master plan of Larkana and Benazirabad. |
 |
Design Review & Construction Supervision of Karachi Hyderabad Motorway (M-9) |
 |
Design Review & Construction Supervision of Karachi Hyderabad Motorway (M-9) |
 |
Contact Award Performa- I & II |
 |
PQ/EOI Document for Consultancy services for design review and construction supervision of Basima Khuzdar N-30 |
 |
PQ/EOI Document For Construction Supervision of Chak Jhumra Interchange on Pindibhattian Faisalabad Motorway. |
 |
PQ/EOI For Construction Supervision of Hiran Minar Interchange on Lahore-Islamabad Motorway(M-2) at Km 51. |
 |
ESIGN REVIEW AND CONSTRUCTION SUPERVISION OF HAZRAT SULTAN BAHOO BRIDGE OVER CHENAB |
 |
Feasibility and Design of Khanozai to Lorali (N-70) Spera Ragha (95 Km) |
 |
|
PROJECT DATA SHEET |
Project Data Sheet |
 |
|
ADB PROJECTS ( RESETTLEMENT PLANS ) |
Resettlement_Plan-ADB_Loan_2019_Balochistan_Road |
 |
Resettlement_Plan-ADB_Loan_2103_NWFP_Road |
 |
Resettlement_Plan-N25_Hub-Uthal |
 |
Resettlement_Plan-N55_Kuchlak-Zhob |
 |
Resettlement_Plan-N70_Multan-Muzaffargarh |
 |
plan ( inpage required ) |
 |
Plan II ( Inpage Required ) |
 |
Table ( Inpage Required ) |
 |
Table Content ( Inpage Required ) |
 |
Annexes Sec A |
 |
SRP Multan-MuzzSection A Revised 3 |
 |
Annex-II |
 |
Stech |
 |
SRP_Section_A_N70-Final (1-6-07) |
 |
Annexes Sec A |
 |
Part-C RP (N-70)-draft final-1 |
 |
RESETTLEMENT PLAN FOR PHASE II-NHIP PROJECTS |
 |
|
SOP |
SOP REGARDING REQUIREMENTS FOR LAYING OF UTILITIES |
 |
|
FINANCIAL STATEMENTS OF NHA |
NHA Financials 1999 |
 |
NHA Financials 2000 |
 |
NHA Financials 2001 |
 |
NHA Financials 2002 |
 |
NHA Financials 2003 |
 |
NHA Financials 2004 |
 |
NHA Financials 2005 |
 |
NHA Financials 2006 |
 |
RMA Financials 2002-03 |
 |
RMA Financials 2003-04 |
 |
RMA Financials 2005-06 |
 |
RMA Financials 2004-05 |
 |
Financial Report of NHIP |
 |
Financial Statements 2006-07 of Main Accounts |
 |
Financial Statements 2006-07 of RMA Accounts |
 |
|
HIGHWAY SAFETY / ROUTINE MAINTENANCE TENDERS FOR MAINTENANCE |
HS-04-07 |
 |
RM-4834 |
 |
RM-4835 |
 |
RM-4836 |
 |
RM-4837 |
 |
PRE-QUALIFICATION OF CONTRACTORS FOR ROUTINE MAINTENANCE CONTACTS IN NROTHERN AREAS REGION |
 |
PRE-QUALIFICATION OF CONTRACTORS FOR PERIODIC MAINTENANCE WORKS IN NROTHERN AREAS REGION |
 |
PRE-QUALIFICATION OF CONTRACTORS FOR HIHGWAY SAFETY CONTRACTS IN NROTHERN AREAS REGION |
 |
PRE-QUALIFICATION OF CONTRACTORS FOR EMERGENCY MAINTENANCE CONTACTS IN NROTHERN AREAS REGION |
 |
Tender Notice For Contracts |
 |
RM-4838 |
 |
HS-05-07 |
 |
HS-06-07 |
 |
HS-07-07 |
 |
HS-08-07 |
 |
HS-09-07 |
 |
HS-10-07 |
 |
HS-11-07 |
 |
HS-12-07 |
 |
HS-13-07 |
 |
HS-14-07 |
 |
TP-01-07 |
 |
BABU SABU |
 |
public notice Sukkur jaccb 2 |
 |
Tender Notice For Contracts |
 |
PM-01-07 |
 |
RM-4836 (Re Tender) |
 |
RM-4837 (Re Tender) |
 |
RM-4838 (Re Tender) |
 |
RM-4839 |
 |
HS-05-07 (Re Tender) |
 |
HS-06-07 (Re Tender) |
 |
HS-07-07 (Re Tender) |
 |
HS-08-07 (Re Tender) |
 |
HS-10-07 (Re Tender) |
 |
HS-14-07 (Re Tender) |
 |
HS-15-07 |
 |
HS-16-07 |
 |
TOR For Intersections N-5 |
 |
HS-17-07 |
 |
RM-4841 |
 |
RM-4842 |
 |
RM-4843 |
 |
EM-04-07 |
 |
EM-05-07 |
 |
EM-06-07 |
 |
EM-07-07 |
 |
HS-18-07 |
 |
PM-5803 |
 |
PM-5804 |
 |
PM-5805 |
 |
PM-5806 |
 |
Expression of Interest for Kohat Tannel |
 |
Notice for pre-qualification of contractors for maintenance works fiscal year 2008-09 |
 |
Prequalification of contractors |
 |
RH-01-07 |
 |
EM-10-07 |
 |
HS-16-07 |
 |
TP-02-07 |
 |
EM_13_07 |
 |
EM_14_07 |
 |
HS_20_07 |
 |
HS_21_07 |
 |
HS_23_07 |
 |
HS_22_07 |
 |
PMF_5807 |
 |
PMF_5808 |
 |
PMS_5809 |
 |
PMS_5810 |
 |
RH_01_07 |
 |
TP_02_07 |
 |
EM_07_07 |
 |
EM_15_07 |
 |
HS_24_07 |
 |
Issuance of Tender Documents for Maintenance Works to Pre-Qualified Contractors |
 |
PMF-5807 |
 |
PMF-5808 |
 |
PMF-5809 |
 |
PMF-5810 |
 |
PMF-5810 |
 |
PMF-5811 |
 |
RH-01-07 |
 |
HS-31-07 |
 |
|
CONTRACTOR PERFORMANCE |
Contractor Performance For Contract 08 (Lahore-Gujranwala) |
 |
Husnain Cotex Profile |
 |
|
TECHNICAL DOCUMENTS |
STANDARDS AND PRACTICES FOR CONTROL SURVEYS |
 |
|
RFP FOR OPERATIONS & MANAGEMENT |
RFPforEmergencyCallingSystem |
 |
Construction of Two Mini Service Areas on Islamabad-Peshawar Motorway M-1 |
 |
REQUEST FOR PROPOSAL For Operations & Management Of (03) Toll Plazas on National Highway Network. Published Date 04-08-2010 |
 |
|
TOTAL SOLUTION DOCUMENTS |
Total Solution Information |
 |
Total Solution Scope |
 |
RFP For Total Solution-Part I |
 |
RFP For Total Solution-Part II |
 |
|
REQUEST FOR PROPOSAL-(ERP) |
REQUEST FOR PROPOSAL PROCUREMENT OF ENTERPRISE RESOURCE PLANING (ERP) SERVICES ORACLE E-BUSINESS SUITE |
 |
Construction of Two Mini Service Areas on Islamabad-Peshawar Motorway M-1 |
 |
|
SINDH PACKAGE |
Sindh Package - Progress Report Upto January 2010 |
 |
MAP OF SINDH REGION |
 |
BRIEF ON SINDH SCHEMES INCLUDING LARKANA PACKAGE |
 |
Revised Sindh Package - October 2009 |
 |
|
REQUEST FOR PROPOSAL (RFP) FOR BOT / PPP PROJECTS |
Commercial Feasibility - Service areas of Islamabad - Murree (IMDC) Expressway at KM 39+800 and 25+800 on BOT Basis |
 |
Technical Proposal Form - Service areas of Islamabad - Murree (IMDC) Expressway at KM 39+800 and 25+800 on BOT Basis |
 |
RFP for Two Service Areas on Islamabad - Peshawar Motorway (M-1) |
 |
Service areas of Islamabad - Murree (IMDC) Expressway at KM 39+800 and 25+800 on BOT Basis |
 |
Construction of Two Mini Service Areas on Islamabad-Peshawar Motorway (M-1) at River Haro on BOT Basis Package-I (At River HARO Islamabad Bound, KM-37+300), II (At River HARO Peshawar Bound, KM-37+300 |
 |
CONSTRUCTION OF KOLPUR BYPASS (N-65) |
 |
|
NHA PPP POLICY |
NHA PPP POLICY For May 2009 |
 |
|
CONTRACT AWARD PERFORMA |
Contract Award Performa 1&2 for Benazirabad Road (Package-1) |
 |
Contract Award Performa 1&2 for Benazir Road (Package-2) |
 |
|
NHA CODE |
NHA CODE-2005 ( Volume-I ) |
 |
|
EARTHQUAKE DAMAGED ROADS |
NHIP revised RAP N5 (Phase II) |
 |
ADDENDUM TO RESETTLEMENT PLAN PHASE II Final |
 |
Bypasses RP Final |
 |
Original RP - EDR (Approved) |
 |
Revised RP EDR (OCT) |
 |
Final 2 Land price study -EDR |
 |
|
DECLARATION OF ASSETS AND ACR FORMS |
Confidential Report Form For Assistants/UDCs/LDCs |
 |
Confidential Report Form For Stenographer/Stenotypists |
 |
ACR For Officers Working in BPS 19 & 20 |
 |
ACR For Officers Working in BPS 17 & 18 |
 |
Performance Report For Officer working in BPS 16 |
 |
Performance Report For Draughtsman/Tracer |
 |
Performance Report For Surveyor |
 |
Performance Report For Lab Tech |
 |
Declaration of Income and Assets- Fiscal Year Ending 30th june-------- |
 |